Guo Feng Steel Limited Company. Steel making plant. Station 2. PRC
|
|
Link:
|
|
|
Year:
|
2008 |
|
Technologies:
|
S7-416/ WINCC V6.0/ OP7/ SIWAREX/ SIMOVERT/ PROFIBUS DP/ ETHERNET |
| Project status: |
Completed
|
| Project Description: |
Control new system of hot metal desulphurization with granulated magnesium without agents . Project , assembly, adjustment |
|
|
|
|
|
|
Pan’gang Group Steel City Enterprises Company. PRC
|
|
Link:
|
|
|
Year:
|
2008 |
|
Technologies:
|
S7-417H/ PCS7/ WinCC Client-Server/ WinCC Redundancy/ SIMOVERT VC/ PROFIBUS DP/ ETHERNET |
| Project status: |
Completed
|
| Project Description: |
Automated control system of Purified TiCl4 Production with a Capacity of 25 000 t/year for Titanium Dioxide Pigment Production.Section 1. Project, adjustment |
|
|
|
|
|
|
ARICOM PLC. PRC
|
|
Link:
|
|
|
Year:
|
2008 |
|
Technologies:
|
S7-417H/ PCS7/ WinCC Client-Server/ WinCC Redundancy/ MP370/ SIMOVERT VC/ PROFIBUS DP/ ETHERNET |
| Project status: |
Completed
|
| Project Description: |
Automated control system of Titanium sponge production.Section 1 to 9. Project, adjustment |
|
|
|
|
|
|
Pan’gang Group Steel City Enterprises Company. PRC
|
|
Link:
|
|
|
Year:
|
2008 |
|
Technologies:
|
S7-417H/ PCS7/ WinCC Client-Server/ WinCC Redundancy/ SIMOVERT VC/ PROFIBUS DP/ ETHERNET |
| Project status: |
Completed
|
| Project Description: |
Automated control system of Purified TiCl4 Production with a Capacity of 25 000 t/year for Titanium Dioxide Pigment Production. Section 2. Project , adjustment |
|
|
|
|
|
|
Yunnan Chaotuo Titanium Industry Co., Ltd. PRC
|
|
Link:
|
|
|
Year:
|
2008 |
|
Technologies:
|
S7-417H/ PCS7/ WinCC Client-Server/ WinCC Redundancy/ OP77B/ SIMOVERT VC/ PROFIBUS DP/ ETHERNET |
| Project status: |
Completed
|
| Project Description: |
Automated control system of commercial Titanium Tetrachloride Production with Charge Preparation. Project , adjustment |
|
|
|
|
|
|
TONGHUA STEEL GROUP CO. LTD. Steelmaking Plant. PRC
|
|
Link:
|
|
|
Year:
|
2007 |
|
Technologies:
|
S7-416/ WINCC V6.0/ OP7/ SIWAREX/ SIMOVERT/ PROFIBUS DP/ ETHERNET |
| Project status: |
Completed
|
| Project Description: |
Control new system of hot metal desulphurization with granulated magnesium without agents . Project , assembly, adjustment |
|
|
|
|
|
|
Zhejiang Yuanli Metal Product Group Co.,Ltd. Steel making plant. PRC
|
|
Link:
|
|
|
Year:
|
2007 |
|
Technologies:
|
S7-416/ WINCC V6.0/ OP7/ SIWAREX/ SIMOVERT/ PROFIBUS DP/ ETHERNET |
| Project status: |
Completed
|
| Project Description: |
Control new system of hot metal desulphurization with granulated magnesium without agents . Project , assembly, adjustment |
|
|
|
|
|
|
Jiangsu Shagang Group Huaigang Special Steel Co., Ltd. Steel making plant. PRC
|
|
Link:
|
|
|
Year:
|
2007 |
|
Technologies:
|
S7-416/ WINCC V6.0/ OP7/ SIWAREX/ SIMOVERT/ PROFIBUS DP/ ETHERNET |
| Project status: |
Completed
|
| Project Description: |
Control new system of hot metal desulphurization with granulated magnesium without agents . Project , assembly, adjustment |
|
|
|
|
|
|
Guo Feng Steel Limited Company. Steel making plant. Station 1. PRC
|
|
Link:
|
|
|
Year:
|
2007 |
|
Technologies:
|
S7-416/ WINCC V6.0/ OP7/ SIWAREX/ SIMOVERT/ PROFIBUS DP/ ETHERNET |
| Project status: |
Completed
|
| Project Description: |
Control new system of hot metal desulphurization with granulated magnesium without agents . Project , assembly, adjustment |
|
|
|
|
|
|
Lengshuijiang Iron Steel&General Works. Steel making plant. PRC
|
|
Link:
|
|
|
Year:
|
2007 |
|
Technologies:
|
S7-416/ WINCC V6.0/ OP7/ SIWAREX/ SIMOVERT/ PROFIBUS DP/ ETHERNET |
| Project status: |
Completed
|
| Project Description: |
Control new system of hot metal desulphurization with granulated magnesium without agents . Project , assembly, adjustment |
|
|
|
|
|
|
Jinxi Iron and Steel Co., Ltd. Steel making plant. PRC
|
|
Link:
|
|
|
Year:
|
2007 |
|
Technologies:
|
S7-416/ WINCC V6.0/ OP7/ SIWAREX/ SIMOVERT/ PROFIBUS DP/ ETHERNET |
| Project status: |
Completed
|
| Project Description: |
Control new system of hot metal desulphurization with granulated magnesium without agents . Project , assembly, adjustment |
|
|
|
|
|
|
Lianyuan Irоn аnd Stееl Group Со., Ltd. PRC
|
|
Link:
|
|
|
Year:
|
2007 |
|
Technologies:
|
S7-416/ PCS7/ WINCC 6.2/ ETHERNET |
| Project status: |
Completed
|
| Project Description: |
Automated control system of ferronickel production technological process. Project |
|
|
|
|
|
|
Baotou Iron & Steel (Group) Co., Ltd. New Steelmaking Plant. PRC
|
|
Link:
|
|
|
Year:
|
2006 |
|
Technologies:
|
S7-416/ WINCC V6.0/ OP7/ SIWAREX/ SIMOVERT/ PROFIBUS DP/ ETHERNET |
| Project status: |
Completed
|
| Project Description: |
Control new system of hot metal desulphurization with granulated magnesium without agents. Project , assembly, adjustment |
|
|
|
|
|
|
Xining Special Steel Co., Ltd. PRC
|
|
Link:
|
|
|
Year:
|
2006 |
|
Technologies:
|
S7-416/ WINCC V6.0/ OP7/ SIWAREX/ SIMOVERT/ PROFIBUS DP/ ETHERNET |
| Project status: |
Completed
|
| Project Description: |
Control new system of hot metal desulphurization with granulated magnesium without agents. Project , assembly, adjustment |
|
|
|
|
|
|
HangZhou Iron & Steel Stock Co., Ltd New Steelmaking Plant. PRC
|
|
Link:
|
|
|
Year:
|
2006 |
|
Technologies:
|
S7-416/ WINCC V6.0/ OP7/ SIWAREX/ SIMOVERT/ PROFIBUS DP/ ETHERNET |
| Project status: |
Completed
|
| Project Description: |
Control new system of hot metal desulphurization with granulated magnesium without agents. Project , assembly, adjustment |
|
|
|
|
|
|
Lianyuan Irоn аnd Stееl Group Со., Ltd. Construction Phase 2. PRC
|
|
Link:
|
|
|
Year:
|
2006 |
|
Technologies:
|
S7-416/ WINCC V6.0/ OP7/ SIWAREX/ SIMOVERT/ PROFIBUS DP/ ETHERNET |
| Project status: |
Completed
|
| Project Description: |
Control new system of hot metal desulphurization with granulated magnesium without agents . Project , assembly, adjustment |
|
|
|
|
|
|
Jiangsu Shagang Group Co., Ltd. РRС
|
|
Link:
|
|
|
Year:
|
2006 |
|
Technologies:
|
S7-416/ WINCC V6.0/ OP7/ SIWAREX/ SIMOVERT/ PROFIBUS DP/ ETHERNET |
| Project status: |
Completed
|
| Project Description: |
Control new system of hot metal desulphurization with granulated magnesium without agents . Project , assembly, adjustment |
|
|
|
|
|
|
Rizhao Steel Group Co., Ltd. Steelmaking Plant #1. PRC
|
|
Link:
|
|
|
Year:
|
2006 |
|
Technologies:
|
S7-416/ WINCC V6.0/ OP7/ SIWAREX/ SIMOVERT/ PROFIBUS DP/ ETHERNET |
| Project status: |
Completed
|
| Project Description: |
Control new system of hot metal desulphurization with granulated magnesium without agents . Project , assembly, adjustment |
|
|
|
|
|
|
Rizhao Steel Group Co., Ltd. Old Steel making plant. PRC
|
|
Link:
|
|
|
Year:
|
2006 |
|
Technologies:
|
S7-416/ WINCC V6.0/ OP7/ SIWAREX/ SIMOVERT/ PROFIBUS DP/ ETHERNET |
| Project status: |
Completed
|
| Project Description: |
Control new system of hot metal desulphurization with granulated magnesium without agents . Project , assembly, adjustment |
|
|
|
|
|
|
JC Erdenet, Mongolia
|
|
Link:
|
http://www.erdenetmc.mn |
|
Year:
|
2006 |
|
Technologies:
|
S7 315-2DP/ SIMOVERT VC/ OP77B/ PROFIBUS DP |
| Project status: |
Completed
|
| Project Description: |
Control system of frequency electrodrive of bridge electromagnetic crane with load-carrying ability 30/12,5 tons |
|
|
|
|
|
|
Taiyuan Iron and Steel Group Co.,Ltd .Ne w Steelmaking Plant. PRC
|
|
Link:
|
|
|
Year:
|
2005 |
|
Technologies:
|
S7-416/ WINCC V6.0/ OP7/ SIWAREX/ SIMOVERT/ PROFIBUS DP/ ETHERNET |
| Project status: |
Completed
|
| Project Description: |
Control new system of hot metal desulphurization with granulated magnesium without agents. Project , assembly, adjustment |
|
|
|
|
|
|
Qingdao Iron and Steel Co., Steelmaking Plant No. 1, China
|
|
Link:
|
|
|
Year:
|
2004 |
|
Technologies:
|
S7-416/ WINCC v6.0/ OP 7/ SIWAREX/ SIMOVERT/ PROFIBUS DP/ ETHERNET |
| Project status: |
Completed
|
| Project Description: |
Project development and implementation of new control system of hot metal desulphurization with granulated magnesium without agents . Project , assembly , adjustment |
|
|
|
|
|
|
Tonghua Iron and Steel Co., Steelmaking Plant No. 1, China
|
|
Link:
|
|
|
Year:
|
2004 |
|
Technologies:
|
S7-416/ WINCC v6.0 / OP 7/ SIWAREX/ SIMOVERT/ PROFIBUS DP/ ETHERNET |
| Project status: |
Completed
|
| Project Description: |
New control system of hot metal desulphurization with granulated magnesium without agents . Project , assembly , adjustment |
|
|
|
|
|
|
Qian'an Iron and Steel Co., China
|
|
Link:
|
|
|
Year:
|
2004 |
|
Technologies:
|
S7-416/WINCC v6.0/ ET200M/ SIWAREX/ SIMOVERT/ PROFIBUS DP/ ETHERNET |
| Project status: |
Completed
|
| Project Description: |
New control system of hot metal desulphurization with granulated magnesium without agents . Project , assembly , adjustment |
|
|
|
|
|
|
Wuhan Iron and Steel Co., Steelmaking Plant No. 3 China
|
|
Link:
|
|
|
Year:
|
2004 |
|
Technologies:
|
S7-416/ WINCC v6.0 / OP7/ SIWAREX/ SIMOVERT/ PROFIBUS DP/ ETHERNET |
| Project status: |
Completed
|
| Project Description: |
New control system of hot metal desulphurization with granulated magnesium without agents . Project , assembly , adjustment |
|
|
|
|
|
|
Xiangtan Iron and Steel Co., Steelmaking Plant, China
|
|
Link:
|
|
|
Year:
|
2004 |
|
Technologies:
|
S7-416/ WINCC v6.0/ OP7 / SIWAREX/ SIMOVERT/ PROFIBUS D / ETHERNET |
| Project status: |
Completed
|
| Project Description: |
New control system of hot metal desulphurization with granulated magnesium without agents . Project , assembly , adjustment |
|
|
|
|
|
|
Xiangtan Iron and Steel Co., Steelmaking Plant No. 1, China
|
|
Link:
|
|
|
Year:
|
2004 |
|
Technologies:
|
S7-416/ WINCC v6.0/ OP7/ SIWAREX/ SIMOVERT/ PROFIBUS DP/ ETHERNET |
| Project status: |
Completed
|
| Project Description: |
New control system of hot metal desulphurization with granulated magnesium without agents . Project , assembly , adjustment |
|
|
|
|
|
|
LiuZhou Iron and Steel Co., China
|
|
Link:
|
|
|
Year:
|
2004 |
|
Technologies:
|
S7-416/ WINCC v6.0/ OP7/ SIWAREX/ SIMOVERT/ PROFIBUS DP/ ETHERNET |
| Project status: |
Completed
|
| Project Description: |
New control system of hot metal desulphurization with granulated magnesium without agents . Project , assembly , adjustment |
|
|
|
|
|
|
Fujian Sangtang Iron and Steel Co., China
|
|
Link:
|
|
|
Year:
|
2004 |
|
Technologies:
|
S7-416/ WINCC v6.0 / OP7/ SIWAREX/ SIMOVERT/ PROFIBUS DP/ ETHERNET |
| Project status: |
Completed
|
| Project Description: |
New control system of hot metal desulphurization with granulated magnesium without agents . Project , assembly, adjustment |
|
|
|
|
|
|
Lianyuan Iron and Steel Co., China
|
|
Link:
|
|
|
Year:
|
2004 |
|
Technologies:
|
S7-416/ WINCC v6.0/ OP7/ SIWAREX/ SIMOVERT/ PROFIBUS DP/ ETHERNET |
| Project status: |
Completed
|
| Project Description: |
New control system of hot metal desulphurization with granulated magnesium without agents . Project , assembly, adjustment |
|
|
|
|
|
|
Dazhou Iron and Steel Co., China
|
|
Link:
|
|
|
Year:
|
2004 |
|
Technologies:
|
S7-416/ WINCC v6.0/ OP7/ SIWAREX / SIMOVERT/ PROFIBUS DP/ ETHERNET |
| Project status: |
Completed
|
| Project Description: |
Control system of hot metal desulphurization with granulated magnesium without agents . Project , assembly, adjustment |
|
|
|
|
|
|
Tangshan Iron and Steel Co., Steelmaking Plant No. 2, China
|
|
Link:
|
|
|
Year:
|
2004 |
|
Technologies:
|
S7-416/ WINCC V6.0/ OP7/ SIWAREX/ SIMOVERT/ PROFIBUS DP/ ETHERNET |
| Project status: |
Completed
|
| Project Description: |
Control system of hot metal desulphurization with granulated magnesium without agents . Project , assembly, adjustment |
|
|
|
|
|
|
Qingdao Iron and Steel Co., Steelmaking Plant No. 1, China
|
|
Link:
|
|
|
Year:
|
2003 |
|
Technologies:
|
S7-416/ WINCC V6.0/ OP 7/ SIWAREX/ SIMOVERT/ PROFIBUS DP/ ETHERNET |
| Project status: |
Completed
|
| Project Description: |
Project development and implementation of new control system of hot metal desulphurization with granulated magnesium without agents . Project , assembly , adjustment |
|
|
|
|
|
|
Tian Jin Iron and Steel Co., Steelmaking Plant No. 1, China
|
|
Link:
|
|
|
Year:
|
2003 |
|
Technologies:
|
S7-416/ SCADA Citect/ OP 7/ SIWAREX / SIMOVERT/ PROFIBUS DP/ ETHERNET |
| Project status: |
Completed
|
| Project Description: |
Project development and implementation of new control system of hot metal desulphurization with granulated magnesium without agents . Project , assembly , adjustment |
|
|
|
|
|
|
Beijing Iron and Steel Co., Steelmaking Plant No. 2, China
|
|
Link:
|
|
|
Year:
|
2002 |
|
Technologies:
|
S7-414/ WINCC v5.1 / OP 7/ SIWAREX/ SIMOVERT/ PROFIBUS DP/ ETHERNET |
| Project status: |
Completed
|
| Project Description: |
Automated control system of two stations of complex hot metal processing . Installation of equipment and implementation of intense sulfur removal from hot metal technology. Project, supply, assembly, adjustment |
|
|
|
|
|
|
Xiangtan Iron and Steel Co., Steelmaking Plant No. 2, China
|
|
Link:
|
|
|
Year:
|
2002 |
|
Technologies:
|
S7-416/ WINCC v5. 1/ OP 7/ SIWAREX/ SIMOVERT/ PROFIBUS DP/ ETHERNET |
| Project status: |
Completed
|
| Project Description: |
Project development and implementation of new control system of hot metal desulphurization with granulated magnesium without agents . Project , assembly , adjustment |
|
|
|
|
|
|
Handan Iron and Steel Co., Steelmaking Plant No. 3, Phase 1, China
|
|
Link:
|
|
|
Year:
|
2002 |
|
Technologies:
|
S7-416/ WINCC v5.1/ OP 7/ SIWAREX/ SIMOVERT/ PROFIBUS DP/ ETHERNET |
| Project status: |
Completed
|
| Project Description: |
Project development and implementation of new control system of hot metal desulphurization with granulated magnesium without agents . Project , assembly , adjustment |
|
|
|
|
|
|
Tangshan Iron and Steel Co., Steelmaking Plant No. 1, China
|
|
Link:
|
|
|
Year:
|
2002 |
|
Technologies:
|
S7-416/ WINCC v5.1/ OP 7/ SIWAREX/ SIMOVERT/ PROFIBUS DP/ ETHERNET |
| Project status: |
Completed
|
| Project Description: |
Project development and implementation of new control system of hot metal desulphurization with granulated magnesium without agents . Project , assembly , adjustment |
|
|
|
|
|
|
Wuhan Iron and Steel Co., Steelmaking Plant No. 1, China
|
|
Link:
|
|
|
Year:
|
2001 |
|
Technologies:
|
S7-315/ OP 7/ WINCC v5.0/ ETHERNET/ PROFIBUS DP/ MIСROMASTER |
| Project status: |
Completed
|
| Project Description: |
Reconstruction of automated control system of two existing stations of hot metal desulphurization with mixture of magnesium and lime to hot metal desulphurization with granulated magnesium without agents . Project, assembly, adjustment |
|
|
|
|
|
|
Beijing Iron and Steel Co., Steelmaking Plant No. 2, China
|
|
Link:
|
|
|
Year:
|
2001 |
|
Technologies:
|
S7-414/ WINCC v4.0 / OP 7/ SIWAREX/ SIMOVERT/ PROFIBUS DP/ ETHERNET |
| Project status: |
Completed
|
| Project Description: |
New control system of hot metal desulphurization with granulated magnesium without agents . Project , assembly , adjustment |
|
|
|
|
|
|
Taiyuan Iron and Steel Co., Steelmaking Plant No. 2, China
|
|
Link:
|
|
|
Year:
|
2001 |
|
Technologies:
|
S7-414/ WINCC V4. 0/ OP 7/ SIWAREX/ SIMOVERT/ PROFIBUS DP/ ETHERNET |
| Project status: |
Completed
|
| Project Description: |
Reconstruction of automated control system of two existing stations of hot metal desulphurization with mixture of magnesium and lime to hot metal desulphurization with granulated magnesium without agents . Project, assembly, adjustment |
|
|
|