Guo Feng Steel Limited Company. Steel making plant. Station 2. PRC
|
|
Link:
|
|
|
Year:
|
2008 |
|
Technologies:
|
S7-416/ WINCC V6.0/ OP7/ SIWAREX/ SIMOVERT/ PROFIBUS DP/ ETHERNET |
| Project status: |
Completed
|
| Project Description: |
Control new system of hot metal desulphurization with granulated magnesium without agents . Project , assembly, adjustment |
|
|
|
|
|
|
CJSC "AzovElektroStal", Mariupol, Ukraine
|
|
Link:
|
http://www.azovelectrostal.com.ua/ |
|
Year:
|
2008 |
|
Technologies:
|
S7-416/ PCS7/ OP177B/ SIWAREX/ SIMOREG/ PROFIBUS DP/ ETHERNET |
| Project status: |
Completed
|
| Project Description: |
Automated control system of steel finishing process at installation “Furnace Ladle”. Station 2. Project , assembly, adjustment |
|
|
|
|
|
|
CJSC "AzovElektroStal", Mariupol, Ukraine
|
|
Link:
|
http://www.azovelectrostal.com.ua/ |
|
Year:
|
2008 |
|
Technologies:
|
S7-416/ PCS7/ OP177B/ SIWAREX/ MICROMASTER/ PROFIBUS DP/ ETHERNET |
| Project status: |
Completed
|
| Project Description: |
Automated control system of alloy materials and additions infusion into furnace DSP-60and furnace-ladle. Project , assembly, adjustment |
|
|
|
|
|
|
Pan’gang Group Steel City Enterprises Company. PRC
|
|
Link:
|
|
|
Year:
|
2008 |
|
Technologies:
|
S7-417H/ PCS7/ WinCC Client-Server/ WinCC Redundancy/ SIMOVERT VC/ PROFIBUS DP/ ETHERNET |
| Project status: |
Completed
|
| Project Description: |
Automated control system of Purified TiCl4 Production with a Capacity of 25 000 t/year for Titanium Dioxide Pigment Production.Section 1. Project, adjustment |
|
|
|
|
|
|
ARICOM PLC. PRC
|
|
Link:
|
|
|
Year:
|
2008 |
|
Technologies:
|
S7-417H/ PCS7/ WinCC Client-Server/ WinCC Redundancy/ MP370/ SIMOVERT VC/ PROFIBUS DP/ ETHERNET |
| Project status: |
Completed
|
| Project Description: |
Automated control system of Titanium sponge production.Section 1 to 9. Project, adjustment |
|
|
|
|
|
|
Pan’gang Group Steel City Enterprises Company. PRC
|
|
Link:
|
|
|
Year:
|
2008 |
|
Technologies:
|
S7-417H/ PCS7/ WinCC Client-Server/ WinCC Redundancy/ SIMOVERT VC/ PROFIBUS DP/ ETHERNET |
| Project status: |
Completed
|
| Project Description: |
Automated control system of Purified TiCl4 Production with a Capacity of 25 000 t/year for Titanium Dioxide Pigment Production. Section 2. Project , adjustment |
|
|
|
|
|
|
Yunnan Chaotuo Titanium Industry Co., Ltd. PRC
|
|
Link:
|
|
|
Year:
|
2008 |
|
Technologies:
|
S7-417H/ PCS7/ WinCC Client-Server/ WinCC Redundancy/ OP77B/ SIMOVERT VC/ PROFIBUS DP/ ETHERNET |
| Project status: |
Completed
|
| Project Description: |
Automated control system of commercial Titanium Tetrachloride Production with Charge Preparation. Project , adjustment |
|
|
|
|
|
|
JSC NTMK, Nijnii Tagil, Russia
|
|
Link:
|
http://www.ntmk.ru |
|
Year:
|
2007 |
|
Technologies:
|
S7-315-2DP/ TP170B/ SIMOVERT VC/ PROFIBUS/ WLAN |
| Project status: |
Completed
|
| Project Description: |
Automated control system of coke-oven battery’s coke pusher |
|
|
|
|
|
|
JSC NTMK, Nijnii Tagil, Russia
|
|
Link:
|
http://www.ntmk.ru |
|
Year:
|
2007 |
|
Technologies:
|
S7-315-2DP/ TP170B/ SIMOVERT VC/ PROFIBUS/ WLAN |
| Project status: |
Completed
|
| Project Description: |
Automated control system of coke-oven battery’s door-extracting machine |
|
|
|
|
|
|
JSC “Dneprospetsstal” A.M.Kuzmina, Zaporozhye
|
|
Link:
|
http://www.dss-ua.com/ |
|
Year:
|
2007 |
|
Technologies:
|
S7 414-2/ SIMODRIVE 611U/ SIMEAS T/ SIMEAS Q/ OP77B/ PROFIBUS/ WINCC6 |
| Project status: |
Completed
|
| Project Description: |
Automated control system of electroslag remelting furnace 1065 |
|
|
|
|
|
|
TONGHUA STEEL GROUP CO. LTD. Steelmaking Plant. PRC
|
|
Link:
|
|
|
Year:
|
2007 |
|
Technologies:
|
S7-416/ WINCC V6.0/ OP7/ SIWAREX/ SIMOVERT/ PROFIBUS DP/ ETHERNET |
| Project status: |
Completed
|
| Project Description: |
Control new system of hot metal desulphurization with granulated magnesium without agents . Project , assembly, adjustment |
|
|
|
|
|
|
Zhejiang Yuanli Metal Product Group Co.,Ltd. Steel making plant. PRC
|
|
Link:
|
|
|
Year:
|
2007 |
|
Technologies:
|
S7-416/ WINCC V6.0/ OP7/ SIWAREX/ SIMOVERT/ PROFIBUS DP/ ETHERNET |
| Project status: |
Completed
|
| Project Description: |
Control new system of hot metal desulphurization with granulated magnesium without agents . Project , assembly, adjustment |
|
|
|
|
|
|
Jiangsu Shagang Group Huaigang Special Steel Co., Ltd. Steel making plant. PRC
|
|
Link:
|
|
|
Year:
|
2007 |
|
Technologies:
|
S7-416/ WINCC V6.0/ OP7/ SIWAREX/ SIMOVERT/ PROFIBUS DP/ ETHERNET |
| Project status: |
Completed
|
| Project Description: |
Control new system of hot metal desulphurization with granulated magnesium without agents . Project , assembly, adjustment |
|
|
|
|
|
|
Guo Feng Steel Limited Company. Steel making plant. Station 1. PRC
|
|
Link:
|
|
|
Year:
|
2007 |
|
Technologies:
|
S7-416/ WINCC V6.0/ OP7/ SIWAREX/ SIMOVERT/ PROFIBUS DP/ ETHERNET |
| Project status: |
Completed
|
| Project Description: |
Control new system of hot metal desulphurization with granulated magnesium without agents . Project , assembly, adjustment |
|
|
|
|
|
|
Lengshuijiang Iron Steel&General Works. Steel making plant. PRC
|
|
Link:
|
|
|
Year:
|
2007 |
|
Technologies:
|
S7-416/ WINCC V6.0/ OP7/ SIWAREX/ SIMOVERT/ PROFIBUS DP/ ETHERNET |
| Project status: |
Completed
|
| Project Description: |
Control new system of hot metal desulphurization with granulated magnesium without agents . Project , assembly, adjustment |
|
|
|
|
|
|
Jinxi Iron and Steel Co., Ltd. Steel making plant. PRC
|
|
Link:
|
|
|
Year:
|
2007 |
|
Technologies:
|
S7-416/ WINCC V6.0/ OP7/ SIWAREX/ SIMOVERT/ PROFIBUS DP/ ETHERNET |
| Project status: |
Completed
|
| Project Description: |
Control new system of hot metal desulphurization with granulated magnesium without agents . Project , assembly, adjustment |
|
|
|
|
|
|
CJSC "AzovElektroStal", Mariupol, Ukraine
|
|
Link:
|
http://www.azovelectrostal.com.ua/ |
|
Year:
|
2007 |
|
Technologies:
|
S7-315-2DP/ OP177B/ MICROMASTER/ PROFIBUS DP/ ETHERNET |
| Project status: |
Completed
|
| Project Description: |
Automated control system of electric filter and two smoke exhausters for gas-cleaning system of “Furnace Ladle” installation and two steel-making furnaces DSP5. Project , assembly, adjustment |
|
|
|
|
|
|
Lianyuan Irоn аnd Stееl Group Со., Ltd. PRC
|
|
Link:
|
|
|
Year:
|
2007 |
|
Technologies:
|
S7-416/ PCS7/ WINCC 6.2/ ETHERNET |
| Project status: |
Completed
|
| Project Description: |
Automated control system of ferronickel production technological process. Project |
|
|
|
|
|
|
CJSC "AzovElektroStal", Mariupol, Ukraine
|
|
Link:
|
http://www.azovelectrostal.com.ua/ |
|
Year:
|
2006 |
|
Technologies:
|
S7 412-2DP/ SIMOVERT VC/ OP170B/ WINCC6 |
| Project status: |
Completed
|
| Project Description: |
Control system of auxiliary pouring-cooling area of molding line modernization |
|
|
|
|
|
|
JSC “Dneprospetsstal” A.M.Kuzmina, Zaporozhye
|
|
Link:
|
http://www.dss-ua.com/ |
|
Year:
|
2006 |
|
Technologies:
|
S7-300/ WINCC |
| Project status: |
Completed
|
| Project Description: |
Automated monitoring and control system of semicontinuous furnace thermal modes |
|
|
|
|
|
|
Baotou Iron & Steel (Group) Co., Ltd. New Steelmaking Plant. PRC
|
|
Link:
|
|
|
Year:
|
2006 |
|
Technologies:
|
S7-416/ WINCC V6.0/ OP7/ SIWAREX/ SIMOVERT/ PROFIBUS DP/ ETHERNET |
| Project status: |
Completed
|
| Project Description: |
Control new system of hot metal desulphurization with granulated magnesium without agents. Project , assembly, adjustment |
|
|
|
|
|
|
Xining Special Steel Co., Ltd. PRC
|
|
Link:
|
|
|
Year:
|
2006 |
|
Technologies:
|
S7-416/ WINCC V6.0/ OP7/ SIWAREX/ SIMOVERT/ PROFIBUS DP/ ETHERNET |
| Project status: |
Completed
|
| Project Description: |
Control new system of hot metal desulphurization with granulated magnesium without agents. Project , assembly, adjustment |
|
|
|
|
|
|
HangZhou Iron & Steel Stock Co., Ltd New Steelmaking Plant. PRC
|
|
Link:
|
|
|
Year:
|
2006 |
|
Technologies:
|
S7-416/ WINCC V6.0/ OP7/ SIWAREX/ SIMOVERT/ PROFIBUS DP/ ETHERNET |
| Project status: |
Completed
|
| Project Description: |
Control new system of hot metal desulphurization with granulated magnesium without agents. Project , assembly, adjustment |
|
|
|
|
|
|
Lianyuan Irоn аnd Stееl Group Со., Ltd. Construction Phase 2. PRC
|
|
Link:
|
|
|
Year:
|
2006 |
|
Technologies:
|
S7-416/ WINCC V6.0/ OP7/ SIWAREX/ SIMOVERT/ PROFIBUS DP/ ETHERNET |
| Project status: |
Completed
|
| Project Description: |
Control new system of hot metal desulphurization with granulated magnesium without agents . Project , assembly, adjustment |
|
|
|
|
|
|
Jiangsu Shagang Group Co., Ltd. РRС
|
|
Link:
|
|
|
Year:
|
2006 |
|
Technologies:
|
S7-416/ WINCC V6.0/ OP7/ SIWAREX/ SIMOVERT/ PROFIBUS DP/ ETHERNET |
| Project status: |
Completed
|
| Project Description: |
Control new system of hot metal desulphurization with granulated magnesium without agents . Project , assembly, adjustment |
|
|
|
|
|
|
Rizhao Steel Group Co., Ltd. Steelmaking Plant #1. PRC
|
|
Link:
|
|
|
Year:
|
2006 |
|
Technologies:
|
S7-416/ WINCC V6.0/ OP7/ SIWAREX/ SIMOVERT/ PROFIBUS DP/ ETHERNET |
| Project status: |
Completed
|
| Project Description: |
Control new system of hot metal desulphurization with granulated magnesium without agents . Project , assembly, adjustment |
|
|
|
|
|
|
Rizhao Steel Group Co., Ltd. Old Steel making plant. PRC
|
|
Link:
|
|
|
Year:
|
2006 |
|
Technologies:
|
S7-416/ WINCC V6.0/ OP7/ SIWAREX/ SIMOVERT/ PROFIBUS DP/ ETHERNET |
| Project status: |
Completed
|
| Project Description: |
Control new system of hot metal desulphurization with granulated magnesium without agents . Project , assembly, adjustment |
|
|
|
|
|
|
CJSC "AzovElektroStal", Mariupol, Ukraine
|
|
Link:
|
http://www.azovelectrostal.com.ua/ |
|
Year:
|
2006 |
|
Technologies:
|
S7-416/ PCS7/ OP177B/ SIWAREX/ SIMOREG/ PROFIBUS DP/ ETHERNET |
| Project status: |
Completed
|
| Project Description: |
Automated control system of steel finishing process at installation “Furnace Ladle”. Station 1. Project , assembly, adjustment |
|
|
|
|
|
|
CJSC "AzovElektroStal", Mariupol, Ukraine
|
|
Link:
|
http://www.azovelectrostal.com.ua/ |
|
Year:
|
2006 |
|
Technologies:
|
S7-314/ OP177B/ MPI |
| Project status: |
Completed
|
| Project Description: |
Automatic control system of bucket-heating station.Project , assembly, adjustment |
|
|
|
|
|
|
Taiyuan Iron and Steel Group Co.,Ltd .Ne w Steelmaking Plant. PRC
|
|
Link:
|
|
|
Year:
|
2005 |
|
Technologies:
|
S7-416/ WINCC V6.0/ OP7/ SIWAREX/ SIMOVERT/ PROFIBUS DP/ ETHERNET |
| Project status: |
Completed
|
| Project Description: |
Control new system of hot metal desulphurization with granulated magnesium without agents. Project , assembly, adjustment |
|
|
|
|
|
|
Qingdao Iron and Steel Co., Steelmaking Plant No. 1, China
|
|
Link:
|
|
|
Year:
|
2004 |
|
Technologies:
|
S7-416/ WINCC v6.0/ OP 7/ SIWAREX/ SIMOVERT/ PROFIBUS DP/ ETHERNET |
| Project status: |
Completed
|
| Project Description: |
Project development and implementation of new control system of hot metal desulphurization with granulated magnesium without agents . Project , assembly , adjustment |
|
|
|
|
|
|
Tonghua Iron and Steel Co., Steelmaking Plant No. 1, China
|
|
Link:
|
|
|
Year:
|
2004 |
|
Technologies:
|
S7-416/ WINCC v6.0 / OP 7/ SIWAREX/ SIMOVERT/ PROFIBUS DP/ ETHERNET |
| Project status: |
Completed
|
| Project Description: |
New control system of hot metal desulphurization with granulated magnesium without agents . Project , assembly , adjustment |
|
|
|
|
|
|
Qian'an Iron and Steel Co., China
|
|
Link:
|
|
|
Year:
|
2004 |
|
Technologies:
|
S7-416/WINCC v6.0/ ET200M/ SIWAREX/ SIMOVERT/ PROFIBUS DP/ ETHERNET |
| Project status: |
Completed
|
| Project Description: |
New control system of hot metal desulphurization with granulated magnesium without agents . Project , assembly , adjustment |
|
|
|
|
|
|
Wuhan Iron and Steel Co., Steelmaking Plant No. 3 China
|
|
Link:
|
|
|
Year:
|
2004 |
|
Technologies:
|
S7-416/ WINCC v6.0 / OP7/ SIWAREX/ SIMOVERT/ PROFIBUS DP/ ETHERNET |
| Project status: |
Completed
|
| Project Description: |
New control system of hot metal desulphurization with granulated magnesium without agents . Project , assembly , adjustment |
|
|
|
|
|
|
Xiangtan Iron and Steel Co., Steelmaking Plant, China
|
|
Link:
|
|
|
Year:
|
2004 |
|
Technologies:
|
S7-416/ WINCC v6.0/ OP7 / SIWAREX/ SIMOVERT/ PROFIBUS D / ETHERNET |
| Project status: |
Completed
|
| Project Description: |
New control system of hot metal desulphurization with granulated magnesium without agents . Project , assembly , adjustment |
|
|
|
|
|
|
Xiangtan Iron and Steel Co., Steelmaking Plant No. 1, China
|
|
Link:
|
|
|
Year:
|
2004 |
|
Technologies:
|
S7-416/ WINCC v6.0/ OP7/ SIWAREX/ SIMOVERT/ PROFIBUS DP/ ETHERNET |
| Project status: |
Completed
|
| Project Description: |
New control system of hot metal desulphurization with granulated magnesium without agents . Project , assembly , adjustment |
|
|
|
|
|
|
LiuZhou Iron and Steel Co., China
|
|
Link:
|
|
|
Year:
|
2004 |
|
Technologies:
|
S7-416/ WINCC v6.0/ OP7/ SIWAREX/ SIMOVERT/ PROFIBUS DP/ ETHERNET |
| Project status: |
Completed
|
| Project Description: |
New control system of hot metal desulphurization with granulated magnesium without agents . Project , assembly , adjustment |
|
|
|
|
|
|
Fujian Sangtang Iron and Steel Co., China
|
|
Link:
|
|
|
Year:
|
2004 |
|
Technologies:
|
S7-416/ WINCC v6.0 / OP7/ SIWAREX/ SIMOVERT/ PROFIBUS DP/ ETHERNET |
| Project status: |
Completed
|
| Project Description: |
New control system of hot metal desulphurization with granulated magnesium without agents . Project , assembly, adjustment |
|
|
|
|
|
|
Lianyuan Iron and Steel Co., China
|
|
Link:
|
|
|
Year:
|
2004 |
|
Technologies:
|
S7-416/ WINCC v6.0/ OP7/ SIWAREX/ SIMOVERT/ PROFIBUS DP/ ETHERNET |
| Project status: |
Completed
|
| Project Description: |
New control system of hot metal desulphurization with granulated magnesium without agents . Project , assembly, adjustment |
|
|
|
|
|
|
Dazhou Iron and Steel Co., China
|
|
Link:
|
|
|
Year:
|
2004 |
|
Technologies:
|
S7-416/ WINCC v6.0/ OP7/ SIWAREX / SIMOVERT/ PROFIBUS DP/ ETHERNET |
| Project status: |
Completed
|
| Project Description: |
Control system of hot metal desulphurization with granulated magnesium without agents . Project , assembly, adjustment |
|
|
|
|
|
|
Tangshan Iron and Steel Co., Steelmaking Plant No. 2, China
|
|
Link:
|
|
|
Year:
|
2004 |
|
Technologies:
|
S7-416/ WINCC V6.0/ OP7/ SIWAREX/ SIMOVERT/ PROFIBUS DP/ ETHERNET |
| Project status: |
Completed
|
| Project Description: |
Control system of hot metal desulphurization with granulated magnesium without agents . Project , assembly, adjustment |
|
|
|
|
|
|
CJSC "AzovElektroStal", Mariupol, Ukraine
|
|
Link:
|
http://www.azovelectrostal.com.ua/ |
|
Year:
|
2004 |
|
Technologies:
|
S7-416/ WINCC v6.0/ OP170/ SIWAREX/ PROFIBUS DP /ETHERNET |
| Project status: |
Completed
|
| Project Description: |
Modernization of Kuenkel - Wagner software of mold production line and mix preparation. Project, adjustment |
|
|
|
|
|
|
Qingdao Iron and Steel Co., Steelmaking Plant No. 1, China
|
|
Link:
|
|
|
Year:
|
2003 |
|
Technologies:
|
S7-416/ WINCC V6.0/ OP 7/ SIWAREX/ SIMOVERT/ PROFIBUS DP/ ETHERNET |
| Project status: |
Completed
|
| Project Description: |
Project development and implementation of new control system of hot metal desulphurization with granulated magnesium without agents . Project , assembly , adjustment |
|
|
|
|
|
|
Tian Jin Iron and Steel Co., Steelmaking Plant No. 1, China
|
|
Link:
|
|
|
Year:
|
2003 |
|
Technologies:
|
S7-416/ SCADA Citect/ OP 7/ SIWAREX / SIMOVERT/ PROFIBUS DP/ ETHERNET |
| Project status: |
Completed
|
| Project Description: |
Project development and implementation of new control system of hot metal desulphurization with granulated magnesium without agents . Project , assembly , adjustment |
|
|
|
|
|
|
Beijing Iron and Steel Co., Steelmaking Plant No. 2, China
|
|
Link:
|
|
|
Year:
|
2002 |
|
Technologies:
|
S7-414/ WINCC v5.1 / OP 7/ SIWAREX/ SIMOVERT/ PROFIBUS DP/ ETHERNET |
| Project status: |
Completed
|
| Project Description: |
Automated control system of two stations of complex hot metal processing . Installation of equipment and implementation of intense sulfur removal from hot metal technology. Project, supply, assembly, adjustment |
|
|
|
|
|
|
Xiangtan Iron and Steel Co., Steelmaking Plant No. 2, China
|
|
Link:
|
|
|
Year:
|
2002 |
|
Technologies:
|
S7-416/ WINCC v5. 1/ OP 7/ SIWAREX/ SIMOVERT/ PROFIBUS DP/ ETHERNET |
| Project status: |
Completed
|
| Project Description: |
Project development and implementation of new control system of hot metal desulphurization with granulated magnesium without agents . Project , assembly , adjustment |
|
|
|
|
|
|
Handan Iron and Steel Co., Steelmaking Plant No. 3, Phase 1, China
|
|
Link:
|
|
|
Year:
|
2002 |
|
Technologies:
|
S7-416/ WINCC v5.1/ OP 7/ SIWAREX/ SIMOVERT/ PROFIBUS DP/ ETHERNET |
| Project status: |
Completed
|
| Project Description: |
Project development and implementation of new control system of hot metal desulphurization with granulated magnesium without agents . Project , assembly , adjustment |
|
|
|
|
|
|
Tangshan Iron and Steel Co., Steelmaking Plant No. 1, China
|
|
Link:
|
|
|
Year:
|
2002 |
|
Technologies:
|
S7-416/ WINCC v5.1/ OP 7/ SIWAREX/ SIMOVERT/ PROFIBUS DP/ ETHERNET |
| Project status: |
Completed
|
| Project Description: |
Project development and implementation of new control system of hot metal desulphurization with granulated magnesium without agents . Project , assembly , adjustment |
|
|
|
|
|
|
JSC "Dneprospetsstal", Zaporozhye, Ukraine
|
|
Link:
|
http://www.dss-ua.com/ |
|
Year:
|
2002 |
|
Technologies:
|
WINAC Slot-412/ ET200M |
| Project status: |
Completed
|
| Project Description: |
Implementation of informational hardware-software complex for stove-busket in steel-rolling shop No. 2. Project, delivery |
|
|
|
|
|
|
CJSC SSPC "DIV", Dnepropetrovsk, Ukraine
|
|
Link:
|
http://www.divltd.com.ua/ |
|
Year:
|
2002 |
|
Technologies:
|
SITOP/ SIRIUS 3R |
| Project status: |
Completed
|
| Project Description: |
Development and implementation of deslagging machine control system. Project , delivery, assembly |
|
|
|
|
|
|
Wuhan Iron and Steel Co., Steelmaking Plant No. 1, China
|
|
Link:
|
|
|
Year:
|
2001 |
|
Technologies:
|
S7-315/ OP 7/ WINCC v5.0/ ETHERNET/ PROFIBUS DP/ MIСROMASTER |
| Project status: |
Completed
|
| Project Description: |
Reconstruction of automated control system of two existing stations of hot metal desulphurization with mixture of magnesium and lime to hot metal desulphurization with granulated magnesium without agents . Project, assembly, adjustment |
|
|
|
|
|
|
Beijing Iron and Steel Co., Steelmaking Plant No. 2, China
|
|
Link:
|
|
|
Year:
|
2001 |
|
Technologies:
|
S7-414/ WINCC v4.0 / OP 7/ SIWAREX/ SIMOVERT/ PROFIBUS DP/ ETHERNET |
| Project status: |
Completed
|
| Project Description: |
New control system of hot metal desulphurization with granulated magnesium without agents . Project , assembly , adjustment |
|
|
|
|
|
|
Taiyuan Iron and Steel Co., Steelmaking Plant No. 2, China
|
|
Link:
|
|
|
Year:
|
2001 |
|
Technologies:
|
S7-414/ WINCC V4. 0/ OP 7/ SIWAREX/ SIMOVERT/ PROFIBUS DP/ ETHERNET |
| Project status: |
Completed
|
| Project Description: |
Reconstruction of automated control system of two existing stations of hot metal desulphurization with mixture of magnesium and lime to hot metal desulphurization with granulated magnesium without agents . Project, assembly, adjustment |
|
|
|
|
|
|
JSC "Dneprospetsstal", Zaporozhye, Ukraine
|
|
Link:
|
http://www.dss-ua.com/ |
|
Year:
|
2000 |
|
Technologies:
|
S7-412/ SIWAREX/ WINCC v4.0 |
| Project status: |
Completed
|
| Project Description: |
Modernization of automated control system of bulk solids' path of argon- oxygen refinement facility in СПЦ 2. Project, supply |
|
|
|
|
|
|
Institute "UKRGIPROMEZ", Dnepropetrovsk, Ukraine
|
|
Link:
|
http://www.gipromez.com.ua/ |
|
Year:
|
2000 |
|
Technologies:
|
S7-315/ WINCC v4.0 |
| Project status: |
Completed
|
| Project Description: |
Development of mathematical model and software of automated control system of kilns of mill 280 in the rolling plant of JSC " Dneprospetsstal ". Project |
|
|
|
|
|
|
JSC "Poltavsky plant of medical glass", Poltava, Ukraine
|
|
Link:
|
http://www.medicalglass.poltava.ua/ |
|
Year:
|
2000 |
|
Technologies:
|
S5-115U/ WINCC v4.0 |
| Project status: |
Completed
|
| Project Description: |
Modernization of automated control system of charge compounding area. Project, supply, assembly, adjustment |
|
|
|
|
|
|
JSC "Mariupol metallurgical plant named after Ilich", Mariupol, Ukraine
|
|
Link:
|
http://www.ilyich.com.ua |
|
Year:
|
2000 |
|
Technologies:
|
S7-314/ InTouch |
| Project status: |
Completed
|
| Project Description: |
Modernization of software and adjustment of automated control system of calcic kiln No. 2. Project, adjustment |
|
|
|
|
|
|
JSC "Mariupol metallurgical plant named after Ilich", Mariupol, Ukraine
|
|
Link:
|
http://www.ilyich.com.ua |
|
Year:
|
1999 |
|
Technologies:
|
S7-214/S7-314/ WINCC v4.0 |
| Project status: |
Completed
|
| Project Description: |
Automated control system of gas record at a metallurgical plant. Project, supply, assembly, adjustment |
|
|
|
|
|
|
JSC "Dneprospetsstal", Zaporozhye, Ukraine
|
|
Link:
|
http://www.dss-ua.com/ |
|
Year:
|
1999 |
|
Technologies:
|
S7-314/ SINUMERIK FM-NC |
| Project status: |
Completed
|
| Project Description: |
Modernization of radial forging machine РКМ -1000. Project, supply, assembly, adjustment |
|
|
|